Project Overview Información en Español

The City of Bonita Springs is designing improvements for East Terry Street from Old 41 Road to Bonita Grande Drive. The purpose of this project is to improve the quality of life in Bonita Springs. The design will include improvements to stormwater structures, sidewalks, multi-use paths, and a roundabout at Morton Avenue. The City received a $16.8 million Community Development Block Grant as a part of the Mitigation Program for the design and construction of these improvements. The design is expected to be complete in summer 2025 and construction is expected to begin in winter 2025/26. A public meeting was held on August 15, 2024.

 


The improvements for this project will:

Provide:

  • Flood relief for isolated areas
  • Piped ditches along corridor
  • Improved cross drain capacity
  • Mitigated roadway resurfacing

Improve multimodal connectivity including:

  • Wider bicycle & pedestrian facilities
  • Safer road crossings
  • Safer intersections
  • Bicycle and pedestrian crossing over I-75

MULTIMODAL IMPROVEMENTS

Multimodal improvements are being designed that will include sidewalks and multi-use paths.

Before

After

A group of cars on a road AI-generated content may be incorrect.

A picture containing text, way, road, highway AI-generated content may be incorrect.

 

 

Before

After

 

EAST TERRY STREET BRIDGE OVER I-75

Proposed improvements include multi-use path, reduce paved shoulders to 3’, and add aesthetic value.

 

Existing Condition

Proposed Condition

A road with trees on the side AI-generated content may be incorrect.

 

MORTON AVENUE INTERSECTION (PROPOSED ROUNDABOUT)

Due to high volume of eastbound (over I-75) rear end crashes, high turning movement volumes and high bicycle/pedestrian volumes at this intersection a roundabout is being proposed.


To view the project presentation click below.

Click Here


To download the project presentation notes click below.

Click Here


Para ver la presentación del proyecto haga clic a continuación.

Click Here


Para descargar las notas de presentación del proyecto haga clic a continuación.

Click Here

For additional information, please contact the City’s project manager:

ELLY SOTO MCKUEN, PROJECT MANAGER

Phone: 239-949-6262
Email: [email protected]